Project Name: Opera House Forecourt Upgrade
Location: Sydney, NSW
Description: All visible elements of the installation were designed and manufactured in brass to blend in with the heritage aspects of the site.All underground components specified as stainless steel.
Project Size: Over 100 lineal metres of Orca products
Products in Use: SH300 channels + customised products. Manufactured to AS3996:2006, AS4586:2013, AS1428.1.
Customisation: Custom made slot drains fabricated with a brass edge. Existing brass grates are positioned over specially made brass edged 300mm wide channel, with a custom designed “secret” locking system, not visible when viewed from above.
Australian Made using recycled content